Logo-of-Delta360-hiring-for-jobs-in-US-on-GrabJobs

CDL Fuel Truck Driver Data Center Construction Project

Job Description - CDL Fuel Truck Driver Data Center Construction Project


Please Read Before Applying

All Delta360 driver applicants must complete the official driver application through Tenstreet. Applications submitted outside of Tenstreet may not be reviewed.

Apply Here: https://intelliapp.driverapponline.com/c/deltafuel

 Location: Hubbard, TX
Schedule: 12-hour shifts, 6–7 days per week
Type: Full-time, long-term project
Compensation: Discussed during interview, plus per diem and housing provided 

We’re looking for highly motivated CDL drivers to support a long-term data center construction project in Hubbard, TX. You’ll keep the jobsite running by fueling construction equipment using bobtail fuel trucks and stationary fueling stations. This is a fast-paced, high-responsibility role for drivers who take pride in safe, reliable work and are ready to commit to a demanding schedule.

Responsibilities

  • Operate bobtail fuel trucks to fuel construction equipment across the jobsite
  • Fuel equipment at stationary fueling stations as needed
  • Follow all DOT, HazMat, and site safety procedures, including spill prevention and PPE use
  • Track and report fuel inventory daily with accurate records
  • Communicate clearly and professionally with customers and site personnel to keep equipment fueled and on schedule
  • Perform and document pre- and post-trip inspections
  • Report any equipment issues, safety concerns, or discrepancies right away

Requirements

• Valid Class A or Class B CDL with HazMat and Tanker endorsements (required)

• Current DOT medical card

• Clean driving record

• Safety-minded, with a strong commitment to following procedures

• Ability to work 12-hour shifts, 6 and sometimes 7 days per week

• Strong attention to detail, especially with inventory and record-keeping

• Excellent communication and customer service skills

• Reliable, self-motivated, and able to work independently or as part of a team

• Ability to pass a background check and DOT drug screen

• Fuel delivery or construction site experience preferred

 

What We Offer

 

• Housing provided

• Per diem

• Overtime pay

• Medical, dental, and vision insurance

• 401(k)

• Long-term, steady work


Original job CDL Fuel Truck Driver Data Center Construction Project posted on GrabJobs ©. To flag any issues with this job please use the Report Job button on GrabJobs.
Share Job
Share Job

Similar CDL Fuel Truck Driver Jobs in the US

GrabJobs is the no1 job portal in the US, connecting you to thousands of jobs fast! Find the best jobs in the US, apply in 1 click and get a job today!

Copyright © 2026 Grabjobs Pte.Ltd. All Rights Reserved.