The roles and responsibilities of the Electrical Commissioning Engineer include all aspects in the commissioning of the Gas Turbine, Steam Turbine, Generator/Syncon (Project Dependent), and Auxiliary equipment for electrical systems are as follows:
MV up to a Maximum of ~20kV the candidate shall be involved with but shall include the GSU which on the primary winding (totally enclosed/sealed) shall be HV.
The end of our scope is at the high side terminals of the GSU.
Oct 2026 through June 2027
The Electrical Commissioning Engineer is expected to spend 80% of each working day in the field working directly with the Customer and or EPC Constructor/3rd Party on the commissioning activities with the remaining 20% for administrative work.