$150,000 - 160,000 yearly
What We're Looking For:
Michael Baker International is actively seeking a Tolling Technical Manager to work on the Mobile River Bridge and Bayway Project which is the largest project in the history of the Alabama Department of Transportation (ALDOT). The project is on Interstate 10 and consists of a new six-lane state-of-the-art cable-stayed bridge across the Mobile River. The Mobile River Bridge will be tolled, and delivery of an All-Electronic Toll (AET) collection program is included with the project. Michael Baker is serving as the Owner’s Project Manager and performs a vast array of duties for ALDOT including oversight of the planning, design, testing, and implementation of Alabama’s first toll collection program, which is expected to start toll collection in 2031.
Tolling is an exciting and challenging component for many transportation infrastructure projects. The selected candidate will join a growing team responsible for the implementation of the toll program and will report directly to the Michael Baker Lead Tolling Manager. The selected candidate is required to have previous management and leadership experience delivering tolling programs and services. The person is expected to act as an extension of ALDOT staff, collaborate with the toll implementation team (ALDOT / Michael Baker / other consultants / design-build team / vendors).
What You'll Do:
What You Need to Succeed:
Compensation:
The approximate compensation range for this position is $150,000 – $160,000 per year. This compensation range is a good faith estimate for the position at the time of posting. Actual compensation is dependent upon factors such as education, qualifications, experience, skillset, and physical work location.
Why Choose Us:
#LI-LM1
Copyright © 2026 Grabjobs Pte.Ltd. All Rights Reserved.