S

VDC Engineer - Data Center Construction

Job Description - VDC Engineer - Data Center Construction

Description

Job Summary

This position is the technical source of modeling information for various projects. The person that fills this role will need to have a thorough knowledge of construction documents, specification, and shop drawings.
Candidate will create 3D/4D/5D models of any given project.

Key Responsibilities

1.    Creates 3D models of Architectural, Structural and MEP systems.
2.    Maintains model libraries using correct uniformat or masterformat codes.
3.    Participates in activities to support the company's strategic planning efforts.
4.    Performs all primary job responsibilities of Virtual Construction Technician.
5.    Reviews bid scope documents for appropriate BIM language based on project delivery type and BIM deliverables.
6.    Trains virtual construction technicians in use of company approved software.
7.    Virtually walks through the model, identifying elements that are out of place.

Minimum Job Requirements

1.    3+ years blue print/specification reading.
2.    3+ years in Autocad/Revit/Navisworks/CPM scheduling software.
3.    4 year degree in Construction Management, Engineering or Architecture.
4.    4+ years' construction experience.
5.    Proficient use of all Microsoft Office Suite programs.

Note: Job Description is subject to change at any time and may include other duties as assigned.

Physical Requirements

1.    May stoop, kneel, or bend, on an occasional basis
2.    Must be able to comply with all safety standards and procedures
3.    Required to use hands to grasp, lift, handle, carry or feel objects on a frequent basis
4.    Will interact with people and technology frequently during a shift/work day
5.    Will lift, push or pull objects pounds on an occasional basis
6.    Will sit, stand or walk short distances for up to the entire duration of a shift/work day.
7.    Will use telephone, computer system, email, and other electronic devices on a frequent basis to communicate with internal and external customers or vendors

Safety Level

Non-Safety Sensitive

Note: Jobs with the Safety-Sensitive designation are those that include tasks or duties that the employer reasonably believes could affect the safety and health of the employee performing the task or others such as
 
operating a vehicle, operating equipment, operating machinery or power tools, repairing/maintaining the operation of any vehicle/equipment, the handling/disposal/transport of hazardous materials, or the handling/treatment/disposal of potentially flammable/combustible materials.




Original job VDC Engineer - Data Center Construction posted on GrabJobs ©. To flag any issues with this job please use the Report Job button on GrabJobs.
Share Job
Share Job

Similar VDC Engineer Jobs in the US

GrabJobs is the no1 job portal in the US, connecting you to thousands of jobs fast! Find the best jobs in the US, apply in 1 click and get a job today!

Mobile Apps

Copyright © 2026 Grabjobs Pte.Ltd. All Rights Reserved.