Wind Site Deputy Manager (Salt Fork)
This position is responsible for assisting in managing and overseeing the daily operations of Salt Fork Wind Facility; a 174.0 MW wind facility, owned by Southern Company’s subsidiary Southern Power, located in Donley County, Texas. The wind farm is equipped with 87 Vestas V100 wind turbines rated at 2.0MW each. This candidate will lead a small team of technicians and third-party wind contractors and will work to establish new operating procedures and will work closely with the rest of Southern Power to communicate and manage the site operations.
Duties include:
JOB RESPONSIBILITIES
JOB REQUIREMENTS (Education, Experience, Knowledge, Skills)
BEHAVIORAL ATTRIBUTES
ADDITIONAL DETAILS
Copyright © 2026 Grabjobs Pte.Ltd. All Rights Reserved.