Logo-of-Apollo-Mission-Critical-Engineering-hiring-for-jobs-in-US-on-GrabJobs

Atlanta - DOD SkillBridge Application (US Military)- Data Center Construction QA/QC Engineer in Trai

Job Description - Atlanta - DOD SkillBridge Application (US Military)- Data Center Construction QA/QC Engineer in Trai

Note: This position is intended for active duty U.S. military service members and reservists on active-duty orders who are eligible for the DoD SkillBridge Program. If this does not apply to you, please apply to one of Apollo’s other open positions.



Locations  


Atlanta-Georgia



Skillbridge Training Program Description   


Apollo’s SkillBridge Program equips transitioning US Military service members with the technical skills, field experience, and industry certifications needed to thrive in the data center commissioning sector. We are seeking highly motivated service members to participate in our Data Center QA/QC Engineer in Training Program, where trainees will gain hands-on experience working on mission-critical projects under the mentorship of senior engineers. This immersive program ensures that all electrical and mechanical equipment meets required specifications and is inspected and installed correctly before commissioning begins. 



 Activities will include, but are not limited to, inspecting and validating key equipment such as generators, transformers, switchgear, medium voltage gear, UPS systems, HVAC units, and Building Management Systems (BMS), reviewing pre-installation checks, pre-energization testing, and overseeing the timely delivery and installation of electrical and mechanical components. 


  


Key Responsibilities   



  • Review design specifications and construction plans to ensure all quality and compliance requirements are identified and integrated.

  • Oversee the receipt, inspection, and storage of equipment to confirm compliance with project specifications before commissioning begins.

  • Perform on-site inspections of mechanical and electrical equipment to verify that materials, systems, and components meet all required standards. 

  • Conduct pre-installation checks and tests, ensuring any non-conformities are documented & corrected before installation. 

  • Collaborate with project managers, suppliers, and contractors to ensure that the supply chain and construction processes are aligned with quality assurance standards.

  • Prepare and maintain detailed documentation of inspections, tests, and quality reports, communicating findings to the project team.  

  • Implement and enforce relevant industry codes, regulations, and standards across all stages of the project.

  • Participate in quality audits and help identify potential risks or areas for improvement to maintain high standards of project execution.

  • Other duties as assigned.  


  


Physical Demands   


The following physical demands must be met to successfully perform the essential functions of this role. Reasonable accommodations may be made to enable individuals with disabilities to perform these functions:   



  • Frequently manipulating, moving, or grasping small parts, devices, or tools.   

  • Frequently required to remain in a stationary position.   

  • Frequently moving through office areas, critical facilities and other environments, including tight and confined spaces.   

  • Exposure to low/high temperatures and outdoor elements such as precipitation and wind.   

  • Working and walking on different types of terrain on active construction sites (e.g., concrete flooring, gravel, unpaved roads).   

  • Frequently ascending and descending stairs and ladders to access equipment.   

  • Occasionally positioning oneself under or over equipment.   

  • Occasionally moving equipment weighing up to 50 pounds.  


 


Qualifications   



  • Active duty or Veteran service member eligible to participate in the DoD SkillBridge program. 

  • Hands-on experience working with electrical systems in a military, industrial, or mission-critical environment (e.g., base facilities, ships, aircraft, or field operations). 

  • Foundational understanding of electrical distribution systems, power generation, UPS systems, or control systems — either through direct work experience or formal technical training. 

  • Strong analytical and troubleshooting skills, with the ability to solve complex problems under pressure. 

  • Good communication and teamwork skills; able to collaborate with cross-functional civilian teams and clients. 

  • Proficient in basic computer applications (MS Office); experience with Procore, CxAlloy, or other commissioning platforms is a plus.



Prerequisites for Training Program 



  • Successful background check, including pre-employment drug screening   

  • US citizens, permanent residents or any candidate with eligibility to work in the US  


 


About Us   


Apollo is a Mission-Critical Infrastructure Engineering, Construction, Commissioning, and Operations Support Services Company. We serve mission-critical industries globally with commissioning, emergency response, operations support, and owner's representative services. Apollo is currently executing projects in multiple states in the United States, in Canada and Brazil.   


   


Since our inception, we have built a commissioning firm based on trust, one relationship at a time. We hire the best people who can handle critical systems, love challenges, and thrive in a dynamic environment. We focus on understanding each client's needs and are relentless in meeting them.  


 


Apollo challenges the brightest, most talented, and driven individuals in the industry by providing an environment that embraces initiative, diversity, and achievement. We are an Equal Employment Opportunity, Affirmative Action employer supporting women, minorities, veterans and people with disabilities. We participate in the Department of Homeland Security E-Verify program.  

Original job Atlanta - DOD SkillBridge Application (US Military)- Data Center Construction QA/QC Engineer in Trai posted on GrabJobs ©. To flag any issues with this job please use the Report Job button on GrabJobs.
Share Job
Share Job

Similar Data Center Construction QA/QC Engineer in Training Jobs in the US

GrabJobs is the no1 job portal in the US, connecting you to thousands of jobs fast! Find the best jobs in the US, apply in 1 click and get a job today!

Copyright © 2026 Grabjobs Pte.Ltd. All Rights Reserved.