Preparing Signal interlocking Plan (SIP) based on Engineering Scale Plan, Existing SIP in PDF format, showing all necessary Information required on SIP, Panel Diagram, Logic Diagram.
Designing / preparation of Table of Control (TOC) based on SIP, Interface Diagram, Station Working Rule (SWR), SWR diagram,
Knowledge on Planning the phasing of Preliminary Design stage to Construction stage work.
Ensuring that designs maximize sustainability outcomes during design phase and over whole life of project.
Producing concept and outline design proposals that solve client challenges in the maintenance, renewal, and enhancement of railways.
Analysis and calculation for Signaling and Telecommunication components.
Liaise with the Client to understand their requirements and then design the optimal solution to meet their goals.
Site survey for preparation of SIP, Cable route plan, proposed shifting of gears etc.
Knowledge on preparation of tender documents and BOQ.
Consult with Consultants and provide continuous feedback on status of project regarding process-related issues.
Requirements
Functions and Responsibilities:
Preparing the below listed plans and drawings:
Preparing Signal interlocking Plan (SIP) based on Engineering Scale Plan, Existing SIP in PDF format, showing all necessary Information required on SIP, Panel Diagram, Logic Diagram.
Designing / preparation of Table of Control (TOC) based on SIP, Interface Diagram, Station Working Rule (SWR), SWR diagram,
All Job Ads are subject to GrabJobs’s Terms of Service. We allow users to flag postings that may be in violation of those terms. Job Ads may also be flagged by GrabJobs moderation team. However, no moderation system is perfect, and flagging a posting does not ensure that it will be removed.
Be the first to receive the latest Others Full-Time Jobs in India.
Setup your job alert:
By activating job alerts, I agree to GrabJobs Terms & Privacy Policy. I can unsubscribe to job alerts anytime.
Skip