Number of Applicants
:000+
Let AI Supercharge Your Job Hunt!
JobCopilot scans 500,000+ company career sites daily to find jobs for you
This is not a pure software role, and it is not a pure field technician role. It requires the rarest combination: someone who can read a PLC tag database export, debate the tradeoffs between KEPServerEX and a Snap7 -based Linux gateway as an OPC UA bridge, and still sit across a table from a European OEM mechanical contractor and discuss motor torque limit parameters.
You will own the Hardware Abstraction Layer (HAL), the translation layer between the Siemens controller and the web backend — and you will be the single point of technical authority for everything between the field devices and the API endpoint.
The role involves three on -site visits to Doha over approximately 22 weeks (audit, integration sprint, commissioning), with the majority of the work conducted remotely.
Key Responsibilities
Conduct an on -site technical audit of the existing Siemens S7 -300 control system: document the full PLC tag database, DB block structure, Profibus DP device map, drive parameter registers, and alarm/event table
Design and implement an OPC UA gateway/bridge that exposes live PLC data to the web application backend — including axis positions (cm slanted), torques, RPMs, limit switch states, operating modes, and alarm states
Define and document the complete read/write tag contract between the PLC and the HAL, including all command words for 7 operating modes (Open, Close Inline, Close Shifted, Chess Pattern, Emergency Retract, Manual/Service, Cleaning) and per -axis position setpoints
Specify and implement the industrial network architecture:
OT/IT segmentation, gateway server placement, connectivity from PLC to edge device to web backend, and RTSP camera VLAN integration Collaborate directly with the software development team (backend/frontend) to define a clean, versioned internal API above the HAL, and provide a data dictionary for time -series ingestion (position, torque, RPM per axis; weather inputs; event and alarm logs) Define fail -safe and degraded -mode behaviour: what happens to the canopy if the web layer loses connectivity, ensuring PLC -side safety logic remains sovereign over all web -initiated commands — particularly the wind -triggered emergency retract sequence
Technically lead discussions with the end client's facilities management team on system architecture, safety interlock hierarchy, and maintenance window planning
Be on -site in Doha for: Week 2 (initial audit, ~1 week), Week 10 (integration sprint, ~1 week), Weeks 21–22 (commissioning and UAT, ~2 weeks)
Produce technical documentation throughout: wiring diagrams, network topology diagrams, tag mapping sheets, API contracts, and a handover package for the client's in -house facilities team
Auto-Apply to Senior Industrial Automation Engineer Jobs with your AI JobCopilot
Copyright © 2026 Grabjobs Pte.Ltd. All Rights Reserved.