£40,000 - 45,000 yearly
Covering the South West of England. Based in or around Bristol ideally. The patch runs from Gloucester down through Bristol and Bath, south through Taunton and towards Hinkley Point. Travel is paid door to door - the day starts when the engineer leaves the house. Note for search: patch tightened south on Martin's instruction - no reach into Worcestershire or the West Midlands.
They design, build and deploy battery-based hybrid power systems, manufactured in the UK. Used across construction, infrastructure, rail, utilities and events. A growing specialist manufacturer, not a facilities contractor. Training is structured and product-led.
Copyright © 2026 Grabjobs Pte.Ltd. All Rights Reserved.