A

Typhoon Halong Lead Carpenter

salary Salary :

$60,513 - 91,030 yearly

Job Description - Typhoon Halong Lead Carpenter



Temporary


Description

SUMMARY: Lead carpenters must be able to lead a crew of 3 to 4 people. Remote Alaska residential remodeling experiences a plus.  

PERFORMANCE RESPONSIBILITIES: include the following. Other duties may be assigned:

  • Study individual job sites, plan work and accurately take off construction material 
  • Estimate amount of work and time required for job
  • Experience building foundations and leveling buildings. 
  • Experience with all phases of residential construction. Installation of windows, doors, Insulation, sealing, flooring siding and roof work. Able to lay out and build stairs. Finish carpentry. Setting cabinets and counter tops. General understanding of electrical and plumbing. 
  • Manage materials and supplies as necessary to facilitate the efficient progression of work on the job. 
  • Understand construction logistics in Rural Alaska. 
  • Prepare project labor coding on timesheets
  • Work with Human Resources Department, Transportation Director to hire supervisor, discipline, and if n necessary fire onsite employees. 
  • Interact with the general public maintaining a professional attitude and working relationship. 
  • Travels frequently within the region for projects. 

Requirements

QUALIFICATIONS: To perform this job successfully, an individual must be able to perform each essential duty satisfactorily. The requirements listed below are representative of the knowledge, skill, and/or ability required. Reasonable accommodations may be made to enable individuals with disabilities to perform the essential functions. Fluency in Yup’ik and English is strongly preferred. Work will be in outdoor environments. May travel by jet, small plane, four wheeler, snow machine, boat.

REQUIREMENTS:

Supervisory Experience

Proof (evidence) of construction supervisory experience – minimum 4 years experience.

Provide resume of previous employment with references

Show proficiency with residential construction 

EDUCATION and EXPERIENCE: Must have a High school diploma or GED. Four (4) years working in a carpenter position. Apprenticeship trade in construction or maintenance is strongly preferred. Must have experience in and knowledge of Personal Protective Equipment (PPE) and use it. 

Certificates, Licenses, Registrations: Valid State of Alaska Driver’s License with a good enough driving record to be insured on the AVCP Vehicle Policy. 


Salary Description

$60,513 - $91,030

Original job Typhoon Halong Lead Carpenter posted on GrabJobs ©. To flag any issues with this job please use the Report Job button on GrabJobs.
Share Job
Share Job

Similar Lead Carpenter Jobs in the US

GrabJobs is the no1 job portal in the US, connecting you to thousands of jobs fast! Find the best jobs in the US, apply in 1 click and get a job today!

Mobile Apps

Copyright © 2026 Grabjobs Pte.Ltd. All Rights Reserved.