The construction requirement is to rehabilitate the water, wastewater, and stormwater utility systems at Fort Wadsworth, Staten Island Unit. This requires the replacement of all waterline mains and distribution systems; replacement of all fire hydrants and installation of new connections for fire sprinkler system; replacement of sewer lines and manholes at Fort Wadsworth historic housing and Headquarters Area.
Qualification:
The CMR shall possess the following qualifications:
Technical knowledge and abilities such as:
Candidates should be able to provide the following to be considered for this position:
Current Resume including the following:
Education and/or professional qualifications:
Copyright © 2026 Grabjobs Pte.Ltd. All Rights Reserved.