Overview of the Role: Responsible for coordinating and managing construction work performed by contractors and/or vendors at the project site. Responsible to assess productivity, schedule compliance, work quality and safety performance on the project.
Responsible to manage walk downs of planned work, validate acceptance of completed work to design requirements, approve contractor payment requests, verify constructability, ensure proper resource allocations, assess field status and resolve issues as needed.
Responsible for scope control, budget oversight, performance reporting, schedules and work in progress to ensure Construction Supervisors are effectively implementing their assignments and obtaining the desired results.
Key Responsibilities:
CMs spend more time at their computer than in the field. They are the quarterback of the project in the field. They are the bridge between the field and the Project Manager. 70% office and 30% field on average in this position.
Preconstruction
Know your contract documents
Know the contractor SAFETY PLAN - This document is how we manage the contractor for safety
Kickoff Meeting - Let the contractor know the expectations for the job
Site Specific Orientation(contractor should host this and NextEra should attend)
You should read and know the permits, road use agreements, crossing agreements, SWPPP, haul routes, drawings, material, schedule, QA/QC, Submittals to engineering for review
Set expectations, lead, and train the NextEra team - Site Safety Orientation - Site Specific Safety Plan - Fill out Safety Assessments / CILs - Documentation (include in Weekly report to CM) - QA/QC
Construction
Develop a good relationship with the contractor (if possible)
Be engaged in the project - Know the schedule (C1 and Contractor P-6) - Track progress, Approve the CSU (project Tracking Spread sheet needs to be accurate) - Monitor the environmental constraints before/during work activities (SWPPP) - Stay involved in outage/ crossing coordination (dont leave it up to the contractor only)
Reporting
The Company needs to collect their own data (do not rely on contractor information, this can be misleading)
Reports must be 100% accurate
Reports/ Trackers are due on Fridays by End of Day 5pm project time Managing Addition Resources.
Environmental
Utilize the environmental team
3rd party audits of contractor
Any communication between Environmentalist and the contractor should not happen directly. This should be directed through the CM.
Perks of Working with AP Recruiters & Associates:
Competitive compensation up to $77.91/hour (depending on experience)
Professional career development and growth opportunities
Comprehensive support throughout your contract assignment
Access to top-tier clients in the energy sector
About the Client: Our client is a leading clean energy company and one of the largest electric utilities in the United States. They are committed to building a sustainable energy future through innovative infrastructure projects including solar, wind, and transmission systems. The company operates across multiple states and is known for its commitment to safety, environmental stewardship, and operational excellence in delivering critical energy infrastructure projects.
All Job Ads are subject to GrabJobs’s Terms of Service. We allow users to flag postings that may be in violation of those terms. Job Ads may also be flagged by GrabJobs moderation team. However, no moderation system is perfect, and flagging a posting does not ensure that it will be removed.
Be the first to receive the latest Others Full-Time Jobs in the US.
Setup your job alert:
By activating job alerts, I agree to GrabJobs Terms & Privacy Policy. I can unsubscribe to job alerts anytime.
Skip
GrabJobs is the no1 job portal in the US, connecting you to thousands of jobs fast!
Find the best jobs in the US, apply in 1 click and get a job today!