Position Title: Scheduler IV
Location: Los Angeles Community College District (Build LACCD) - Los Angeles Harbor
College and Los Angeles Southwest College - (On-Site)
Requisition #: SAC-508
Position Description
Overview
The Scheduler IV will work with CLMI client on site at the Los Angeles Community College District (Build LACCD). There are two openings: one at Los Angeles Harbor College and one at Los Angeles Southwest College. (Candidates must be willing and able to commute to the Los Angeles, CA office and make site visits as necessary)
Duties:
● Coordinate the preparation of project schedules based on defined project execution
philosophies.
● Perform contractor schedule reviews for contract conformance and quality assurance.
● Evaluate contract change orders and amendments for impact on budget and schedule.
● Perform time impact analysis of project schedule delays and potential claims.
● Participate in change order negotiations.
● Perform Critical Path and Earned Value analyses.
● Identify schedule related problems which arise during project execution and recommend corrective actions and creative solutions.
● Conduct construction/project site visits for progress reporting.
● Review contractor’s weekly and monthly schedule progress, prepare narrative of findings, submit and present to management for decision making.
● Review and evaluate contractor recovery schedules.
● Perform cost analysis in support of design and construction phases of capital projects.
● Analyze actual expenditures versus budget performance.
● Prepare cost loaded schedule to support comprehensive cash flow projections.
● Understand, interpret and apply contracts, policies and procedures within Build LACCD guidelines.
● Communicate effectively orally and in writing.
● Flexibility in schedule and transportation to work at multiple sites based on assigned schedule and duties.
● Ability to work in a fast-paced environment.
Minimum Requirements
● 10 years of experience in project or program scheduling on large construction programs.
● Bachelor’s degree in Architecture, Engineering, Construction Management, Business Administration or other related field. Additional qualifying experience in excess to the minimum stated above may be substituted for the required education on a year for year basis.
● Advanced proficiency in specified software including, but not limited to, Primavera Scheduling Software, MS Office Applications including Project, Excel, Word and PowerPoint.
● Knowledge of theories, principles and practices of cost engineering and scheduling.
● Experience with time impact analysis.
● Experience with construction claims and change orders.
● Flexibility in schedule and transportation to work at multiple sites based on assigned schedule and duties.
Element-Specific Requirements/Notes
● May assume other duties as required/needed.
● This is NOT a work from home position.
● This is a Monday-Friday full-time position at the project site(s).
● Transportation to/from project worksite(s) is the responsibility of the employee.
CLMI Group is an Equal Opportunity Employer. All qualified applicants will receive consideration for employment without regard to race, color, religion, sex, national origin, disability, or protected veteran status.
The offered rate of compensation will be based on a variety of non-discriminatory factors, including education, qualifications, experience, and geographic location. The salary range for this position is $145,000-155,000.
Copyright © 2026 Grabjobs Pte.Ltd. All Rights Reserved.