Data Center Construction Project Engineer - Dynamic Team

salary Salary :

$35 - 39 hourly

icon briefcase Job Type : Full Time

Number of Applicants

 : 

000+

Click to reveal the number of candidates who applied for this job.
icon loader
icon loader

This job is no longer accepting applications.

Scroll down below to view similar jobs .

Job Description - Data Center Construction Project Engineer - Dynamic Team

We are searching for an analytical Data Center Construction Project Engineer to join our stellar team at Intelliswift Software Inc in New Albany, OH.
Growing your career as a Full-Time Data Center Construction Project Engineer is an amazing opportunity to develop exceptional skills.
If you are strong in problem-solving, strategic planning and have the right enthusiasm for the job, then apply for the position of Data Center Construction Project Engineer at Intelliswift Software Inc today!

Pay rate range - $35/hr. to $39/hr. on W2
Daily Schedule: M-F, 7-4, 9-5 (some flexibility on time, but will be day shift)

Must Have
Experience reading and interpreting construction drawings and specifications.
+2 years’ experience working in the construction industry or an engineering organization.
Experience updating and managing data including milestone dates, RFI’s, design changes, and change orders in project management software such as Procore

REQUIRED SKILLS
  • Experience updating and managing data including milestone dates, RFI’s, design changes, and change orders in project management software such as Procore.
  • Experience with developing workflows and tracking systems including change management, vendor equipment delivery, and document controls across 3 or more organizations/teams.
  • Experience reading and interpreting construction drawings and specifications.
  • Experience working with IT tools such as MS Office Suite including Project, Excel, and Word.
Preferred:
  • A four-year degree in a technical field such as engineering, construction management, or a trade school.
  • Experience in a mission-critical data center.
Years of Experience:
+2 years’ experience working in the construction industry or an engineering organization.

Responsibilities of the Data Center Construction Project Engineer will be responsible for:
- Establishing communication and coordination across a data center region’s construction managers, general contractors, stakeholders, and internal teams. Examples include monitoring KPI metrics and construction status.
- Develop and maintain a tracking system for design changes, RFI’s (requests for information), and change orders and dashboard and track this information for regional leadership review. Include tracking status of priority and due dates.
- Requesting and reviewing MOPs (Method of Procedure) for proper detail, necessity, and risk.
- Onboarding new vendors for badging and orientation.
- Updating project management software with milestone dates, correspondence, and documents.
- Monitor delivery of owner-furnished material to site.
- Compiling and storing construction data from vendors.

REQUIRED SKILLS
• +2 years’ experience working in the construction industry or an engineering organization.
• Experience updating and managing data including milestone dates, RFI’s, design changes, and change orders in project management software such as Procore.
• Experience with developing workflows and tracking systems including change management, vendor equipment delivery, and document controls across 3 or more organizations/teams.
• Experience reading and interpreting construction drawings and specifications.
• Experience working with IT tools such as MS Office Suite including Project, Excel, and Word.

PREFERRED SKILLS
• A four-year degree in a technical field such as engineering, construction management, or a trade school.
• Experience with project management software tools and document control.
• Experience with AutoCAD or similar computer-aided design software.
• Experience in a mission-critical data center.
• Experience with mechanical systems including air handlers and building management systems.
• Experience with electrical systems including diesel generators, uninterruptible power systems, switchboards, transformers, and power distribution units. Experience with project management principles and best practices.

Benefits of working as a Data Center Construction Project Engineer in New Albany, OH:


● Career Growth Potential
● Professional Development Opportunities
● Leading Industry Pay
Original job Data Center Construction Project Engineer - Dynamic Team posted on GrabJobs ©. To flag any issues with this job please use the Report Job button on GrabJobs.

This job is no longer accepting applications.

Scroll down below to view similar jobs .

icon no cv required No CV Required icon fast interview Fast Interview via Chat

Share this job with your friends

icon get direction How to get there?

icon geo-alt New Albany, Oh

icon get direction How to get there?
View similar jobs below

Similar Jobs in the US

🔎

People also search for

GrabJobs is the no1 job portal in the US, connecting you to thousands of jobs fast! Find the best jobs in the US, apply in 1 click and get a job today!

Mobile Apps

Copyright © 2024 Grabjobs Pte.Ltd. All Rights Reserved.