Ensure that all released work orders are aligned with the Master Production Schedule (MPS) and any updated changes from the Master Scheduler.
Confirm that required documents, routings, and traveler packets are complete and correct.
Track the progress of open work orders through each production stage.
Validate that work orders are progressing according to schedule.
Identify bottlenecks or delays and escalate to the Master Scheduler and Production Leads.
Ensure that completed work orders are properly closed in the ERP system.
Verify that labor, materials, and machine time are accurately recorded and posted.
Support cycle time tracking, variance analysis, and production traceability.
Maintain real-time status updates of active production orders.
Reconcile discrepancies between planned vs. actual progress.
Provide reports on WIP, completions, and order backlogs to the Master Scheduler or Operations leadership.
An understanding of ERP/MRP planning system operation and function.
COMPETITIVE BENEFITS: (visit usbenefits.nov.com for more information about our benefits offerings)
Copyright © 2026 Grabjobs Pte.Ltd. All Rights Reserved.