Logo-of-Legacy-Professional-Services,-Llc-hiring-for-jobs-in-US-on-GrabJobs

QA/QC Manager - Hyperscale Data Center Construction

Job Description - QA/QC Manager - Hyperscale Data Center Construction

Description

The QA/QC Manager is responsible for leading and implementing the Quality Assurance and Quality Control program on a large-scale hyperscale data center construction project. This role ensures all work meets contractual requirements, project specifications, industry codes, and owner standards, with a focus on mission-critical systems (MEP, commissioning, and fit-out). The QA/QC Manager will establish and maintain rigorous inspection protocols, coordinate third-party testing, and proactively engage with project teams, trade partners, and the client to drive a culture of quality and zero-defect delivery.



Requirements

Quality Assurance & Planning

  • Develop, implement, and manage the project-specific Quality Management Plan in alignment with company and client standards.
  • Review and interpret construction drawings, specifications, and submittals to ensure compliance with contract documents.
  • Conduct constructability and quality reviews during preconstruction and early trade coordination phases.
  • Coordinate quality requirements with design teams, consultants, and client representatives.

Inspections & Field Execution

  • Lead and document field inspections for structural, architectural, civil, and mission-critical MEP systems.
  • Ensure proper execution of inspections and tests, including underground utilities, concrete, steel, prefabricated assemblies, and clean agent/specialty systems.
  • Oversee and manage third-party testing and inspection agencies, ensuring accurate documentation and resolution of nonconformances.
  • Proactively monitor installation methods and workmanship to mitigate punch list and rework.

Trade Partner & Stakeholder Engagement

  • Train and coach subcontractors and field staff on quality requirements, processes, and best practices.
  • Collaborate closely with Safety, Commissioning, and VDC/BIM teams to ensure coordinated quality across disciplines.
  • Facilitate quality-focused meetings with stakeholders, ensuring timely resolution of quality issues.

Documentation & Reporting

  • Maintain and manage all quality-related logs, inspection reports, test results, and deficiency tracking using project management software (e.g., Procore, BIM 360, Bluebeam).
  • Track and report KPIs on defect trends, rework costs, and inspection performance.
  • Ensure proper close-out documentation, O&M manuals, and turnover packages are complete and accurate for client acceptance.

Qualifications

  • Bachelor’s degree in Construction Management, Engineering, or related field (preferred).
  • 7+ years of experience in QA/QC management within large-scale construction, with at least 3 years on mission-critical or hyperscale data center projects.
  • Strong knowledge of construction codes, standards, and specifications (ICC, NFPA, ASHRAE, IEEE, NEC, etc.).
  • Familiarity with owner standards and requirements for hyperscale clients (Meta, Google, Microsoft, Amazon, etc.).
  • Proficiency with construction management software (Procore, BIM 360, Bluebeam, CMiC).
  • Exceptional communication, leadership, and problem-solving skills.
  • Certifications such as ASQ Certified Quality Manager, CQM-C (USACE/NAVFAC), or ICC preferred.

Key Competencies

  • Detail-oriented with a proactive approach to quality.
  • Strong leadership and ability to influence cross-functional teams.
  • Excellent organizational and documentation skills.
  • Ability to thrive in fast-paced, large-scale project environments.
  • Commitment to zero-defect project delivery and continuous improvement.
Original job QA/QC Manager - Hyperscale Data Center Construction posted on GrabJobs ©. To flag any issues with this job please use the Report Job button on GrabJobs.
Share Job
Share Job

Similar QA/QC Manager Jobs in the US

GrabJobs is the no1 job portal in the US, connecting you to thousands of jobs fast! Find the best jobs in the US, apply in 1 click and get a job today!

Mobile Apps

Copyright © 2026 Grabjobs Pte.Ltd. All Rights Reserved.