I

Senior Construction Scheduler

salary Salary :

$132,600 - 148,200 yearly

Job Description - Senior Construction Scheduler

JOB TITLE: SENIOR CONSTRUCTION SCHEDULER

LOCATION: Arnold Air Force Base, Tullahoma, TN

JOB DESCRIPTION

iParametrics is partnering with a leading engineering, procurement, and construction company to support three large projects under the test operations and sustainability program for the Department of Defense at Arnold Air Force Base in Tullahoma, TN. (Tullahoma is southeast of Nashville.)  We are seeking a skilled Senior Construction Scheduler to join our team.

The Senior Construction Scheduler is responsible for creating, managing, and maintaining integrated project schedules to support large-scale construction projects. This role collaborates with project teams, estimators, and stakeholders to ensure seamless coordination of activities, accurate reporting, and alignment with project objectives. The Senior Construction Scheduler oversees scheduling efforts and ensures all plans are aligned with technical approaches, cost estimates, and compliance standards.

RESPONSIBILITIES

  • Develop and manage integrated construction schedules using Primavera P6, aligning with the project’s technical approach and milestones.
  • Oversee and guide schedulers in creating and maintaining project schedules.
  • Collaborate with the estimating team to ensure accurate integration of scheduling data with cost control systems, such as Cobra.
  • Participate in schedule review processes, incorporating feedback to ensure accuracy and alignment with project requirements.
  • Monitor and update project schedules to reflect progress, identify delays, and propose corrective actions to keep projects on track.
  • Ensure schedules comply with applicable Federal, State, and Local codes and standards, including Department of Energy (DOE) Orders when required.
  • Provide detailed schedule analysis and reporting for stakeholders, highlighting potential risks and opportunities.

BASIC QUALIFICATIONS

  • U.S. Citizenship is required.
  • A minimum of 14 years of experience in project scheduling or project controls, with a focus on construction projects.
  • Advanced proficiency with Primavera P6 scheduling software.
  • Strong knowledge of Federal, State, and Local codes and standards relevant to project controls, including DOE regulations.
  • Proven ability to work collaboratively with multidisciplinary teams, including estimators, engineers, and project managers.
  • Excellent communication skills to present scheduling updates and analyses to stakeholders effectively.

PREFERRED QUALIFICATIONS

  • Experience with cost control tools and integration of scheduling and cost data (e.g., Cobra).
  • Familiarity with large-scale construction projects, particularly industrial or infrastructure-related efforts.
  • Strong analytical skills with a focus on identifying schedule risks and proposing mitigation strategies.
  • Professional certifications such as Planning and Scheduling Professional (PSP) or Project Management Professional (PMP) are a plus.

BENEFITS & COMPENSATION

As a W2 employee of iParametrics, team members are eligible for benefits such as medical, dental and vision insurance, company matching 401K plan, and PTO. All benefits are subject to plan terms and applicable waiting periods. This is an exempt position with an annual salary of $132,600 to $148,200 based on experience, background, and skills.

PROJECT LOCATION & PER DIEMS

Arnold Air Force Base is approximately  one hour southeast of suburban Nashville, TN. All candidates should expect to be on site at the project for its duration of approximately two years. Per diems and rotations will not be provided. Relocation assistance may be available for qualified candidates.

ABOUT IPARAMETRICS

iParametrics delivers a variety of mission-critical management and support services for construction, emergency management, homeland security, risk management, and other programs to commercial and public sector clients. We were founded in 2003 and are based in metro Atlanta, Georgia, with staff and project offices nationwide.  For over 20 years, we have provided guidance and expertise to help our clients confidently navigate the most challenging and complex issues relating to the safety and security of their people, assets, and operations. This includes technical and programmatic support of complex critical infrastructure programs in 39 countries, all 50 states, and three US Territories.

iParametrics is an Equal Opportunity Employer. We are committed to a work environment that supports and respects all individuals without discrimination based on race, color, religion, national origin, age, sex, pregnancy, marital status, disability status, genetics, protected veteran status, sexual orientation, gender identity or expression, or any other characteristic protected by federal, state, or local laws.

Application review will consider without limitation the following criteria: qualifications, education, and experience specific to the job description/duties as well as prior experience with leading A/E, EPC, and construction companies. Applicants must be able to pass all required background checks including a drug test.

This job description is intended to outline the general nature and level of work that would be performed by project team members. It is not designed to cover or contain a comprehensive list of all responsibilities, duties, or skills required for this job. This description is subject to change at the discretion of the company, with or without notice.

 
Original job Senior Construction Scheduler posted on GrabJobs ©. To flag any issues with this job please use the Report Job button on GrabJobs.
Share Job
Share Job

Similar Construction Scheduler Jobs in the US

GrabJobs is the no1 job portal in the US, connecting you to thousands of jobs fast! Find the best jobs in the US, apply in 1 click and get a job today!

Mobile Apps

Copyright © 2026 Grabjobs Pte.Ltd. All Rights Reserved.