Logo-of-OWAIS-CONSTRUCTION-GROUP-hiring-for-jobs-in-US-on-GrabJobs

Sr. Construction Scheduler

salary Salary :

$140,000 - 180,000 yearly

Job Description - Sr. Construction Scheduler



Benefits:


  • 401(k) matching

  • Dental insurance

  • Health insurance

  • Paid time off

  • Vision insurance




Job description
A leading construction management firm is seeking senior-level schedulers to join their team supporting Los Angeles Metropolitan Transit Authority rail projects. The successful candidate will have knowledge and experience in document control & configuration management for civil, structural, electrical, mechanical, track, utilities, light rail maintenance and storage facilities, and light rail systems.


Duties include but are not limited to:

  • Support project management with scheduling deliverables based upon program management department policies and procedures as follows:

  • Develop and maintain cost loaded and integrated project master schedule, control level schedule and detailed schedules.

  • Identify key activities, milestones, constraints, and interfaces for coordination purposes.

  • Establish and monitor the schedule critical path and assess schedule variances.

  • Support project and program meetings and review contractor schedule deliverables in accordance with contract specifications.

  • Perform schedule time impact analysis of potential delay items and provide recommendations for delay mitigation.

  • Develop schedule contingency analysis. Perform contingency drawdown analysis as part of forecasting and trend analysis.

  • Evaluate schedule trends and develop mitigation measures to deliver projects on-time.

  •  Maintain all data within the Project Management Information System (PMIS).


Qualifications

  • Experienced with updating and maintaining data in Primavera Unifier

  • A minimum of 5 years' experience performing configuration management work.

  • Analyze, quality check, file, and retrieve electronic construction-related documents

  • Process documents on incoming and outgoing transmittals

  • Review and/or quality check technical reports, specifications, drawings, and other documents

  • Identify and use the correct tools, systems, and techniques to index, file, and control documentation

  • Work with multiple contractors, project team members, and project management with the control, distribution, maintenance, and retrieval of project-related documents

  • Work proactively to resolve issues and mitigate risks

  • Support other team members and the client on document control procedures

  • Bachelor's degree in engineering, construction management, or business

  • 5 years' experience scheduling in Primavera P6 on large civil projects

  • AACE International certification is highly preferred




Compensation: $140,000.00 - $180,000.00 per year






Original job Sr. Construction Scheduler posted on GrabJobs ©. To flag any issues with this job please use the Report Job button on GrabJobs.
Share Job
Share Job

Similar Construction Scheduler Jobs in the US

GrabJobs is the no1 job portal in the US, connecting you to thousands of jobs fast! Find the best jobs in the US, apply in 1 click and get a job today!

Mobile Apps

Copyright © 2026 Grabjobs Pte.Ltd. All Rights Reserved.