· Conducting SWC coordination meeting with LTA E&M team, LTA project team, N1007 and SWC’s.
· Checking the BIM model before issuing to N1007 for CCSM, CSD/SEM, CSCSM for their preparation and submission to LTA.
· Reviewing consultant drawing and submission to LTA and N1007 for review and approval.
· Designing Tunnel cable brackets, Service crossover bridge, VICP and CRP for LTA’s System Wide Contractors (SWC).
· Liaising with vendor to check and verifying the LTA design requirements and compliances.
· Preparing E&M Niches drawing as per contract and LTA/SWC’s requirement,
· Checking ST submission drawing, Tunnel alignment drawings, vertical alignment drawings & long section drawings for coordination with SWC’s and tunnel bracket design.
· Designing tunnel walkaway pipe trench based on working session with LTA SWC coordinator and consultant as per their requirement.
· Coordination with vendor for Architectural works.
· Coordinating with clients, SWC,project team and contractors for E&M design and construction works.
· Assisting and explaining BIM team to model the E&M related works like Plumbing, Sanitary, CSD/SEM, Airwell and submission to LTA for approval.
· Liaising with Architect for design coordination.
· Attending LTA’s Line wide NSC E&M meeting, Weekly design meeting and progress meeting.
· Liaising with own structural consultant for M&E design requirement and coordination.
· Liaising with Interfacing contractors for SWC related matters.
· Assisting PD/SPM for urgent works and E&M related works.
· Preparing temporary design drawing for Bus stop, Pedestrian Overhead bridge, Walkaway for LTA approval.
· Preparing design drawings like SWC equipment delivery and future replacement drawing, CSD drawing for LTA review and approval.
· Reviewing all LTA E&M SWC design drawing for coordination such as Tunnel ventilation system, Niches, AID camera, LUS, LBS, MVMS, PA, CCTV etc.
· Liaising with LTA MES team for Tunnel jet fan coordination and Air Monitoring System equipment’s.
· Attending BIM coordination meeting with N1007 & LTA for BIM CCSM and CSCSM coordination.
· Preparing cover letter, scope of works and formal drawing submission with QAQC team for drawing submission to LTA.
· Highlighting QS team for changes in tender drawing compare with latest issued design drawings.
· Executing Singapore standards COP and requirements.
· Prepare SWC coordination meeting minutes.
· Updating SWC items inputs/status in LTA progress and design meeting.
· Checking & review documents & drawings before submission to clients.
· Preparing E&M Niches drawing.
· Liaising with Architect & structural consultant for design coordination.
· Assisting Design Manager/Project Director for urgent works and E&M related works.
· Preparing temporary design drawing.
· Ad-hoc works.